Elevate Your Power Management with Huijue Group's Energy Cabinets HJ-ESS-215A(100KW215KWh)
Huijue Group’s energy cabinet is the core component of distributed energy storage. Its intelligent installation and operation reduce on-site and maintenance workload by 70%. Utilizing non-isolation design enhances system efficiency, while independent cell clustering reduces power loss. A six-layer security protection design ensures system safety. Additionally, the energy cabinet supports multi-information integration and remote upgrades, achieving an upgrade efficiency increase of over 90% compared to traditional methods.
- Swift power response, compatible with virtual power plant, grid-connected, off-grid, and other operational modes.
- All-encompassing design drastically reduces transportation time, on-site installation costs, and duration.
- Local data gathering, intelligent monitoring, and remote operation and maintenance capabilities.
- Standardized interfaces enable parallel connection of multiple units, facilitating seamless expansion and ensuring streamlined batch manufacturing processes.
- Intelligent installation and operation, featuring node adaptability, fault indication, and more, reducing on-site and operational maintenance workload by 70%.
- Non-isolation design enhances system efficiency; each battery operates independently within a single cluster, minimizing power loss without circulation.
- Six-layer security protection design incorporating multi-information integration.
- Local and remote upgrade options, supporting broadcast program upgrades, improving efficiency by over 90% compared to traditional point-to-point upgrades.
- Peak-valley electricity regulation
Utilizing energy storage devices to discharge electricity during peak electricity demand, thereby reducing high electricity bills.
- Enhance the stability of the power system
By storing energy and releasing it when needed, stabilize the intermittent output of renewable energy, thereby enhancing the stability of the power system.
- Emergency backup power supply
Provide power to the load in the event of a power grid outage or lack of power supply, or serve as backup power.
- Peak-valley electricity price utilization
Utilize the high and low electricity prices in different time periods for electricity trading to gain profits.
- Optimize the utilization of renewable energy
Maximize the use of photovoltaic power during the day, while storing excess electricity for use at night, thereby optimizing energy utilization efficiency.
- Reduce investment costs in power grid upgrades and transformations
In distributed power system scenarios, reduce the initial investment costs of power grid construction.
Parameters
Product model: HJ-ESS-215A (100KW/215KWh) | |||
---|---|---|---|
DC parameters | AC parameters | ||
Battery Type | Lithium Iron Phosphate | AC side rated power | 100KW |
Cell capacity | 3.2V/280Ah | Maximum power on AC side | 110KW |
System battery configuration | 1P240S | Cable total harmonic distortion rate | <3% of rated power |
Battery rated capacity | 215kWh | AC side rated voltage | 380VAC |
Battery voltage range | DC636-876V | Communication access method | 3P+N+PE |
Charge and discharge rate | 0.5C | Rated grid frequency | 50/60Hz |
Discharge depth |
80% | Power factor range | 0.98 |
Battery cooling method | air cooling | Off-grid operation | support |
System parameters | |||
size | 1600*1280*2200mm(reference) | Temperature control method | Industrial grade temperature controlled air conditioner |
Protection level | IP55 | fire protection plan | Aerosol, perfluorohexanone |
System communication protocol | Standard: Modbus | Communication Interface | RS485, RJ45 |